Monday, May 3, 2010
Up at 5:30am, drywall delivery at 6:30am
It's been a long Monday and its only 10am! We were up at 5:30am to protect doorways and windows that drywall would be coming through and label last minute wires to "pull" or "not pull" through during installation. The crew arrived at 7am and drywall came late, about 7:15am, and I was off to work by 8am. Check out this truck! Very exciting!