I've been delinquent in posting but we're making a lot of progress. The largest challenge has been dealing with our circus of unsophisticated, irrational contractors. For the longest time our plumber was MIA and slow but he is a truly honest guy and now he's coming through for us. Then recently our HVAC contractor tried to guilt us into paying him before he was done by bringing up a "trust" issue, which we've heard before and makes us furious. Now, our electrician who's hard up for cash just hit us with a completely bogus $1,300 change order and since we said 'no' has not returned to work. It's just never easy!

The picture here is of Joshua, our plumber from Nigeria, testing the drain pipes today for leaks. He's going to use air to test the supply pipes since it's getting cold now, we definitely don't want water that could freeze in there.
The faucet also shown here caused a lot of headache. Unfortunatley the hardware on this one didn't match the install manual , our experienced plumber was totally confused, and communication with the UK manufacturer was non-existant, but finally Eric realized he could just hook a hose up to it and figure out where the water came out, so now we are good to go. We have a shower head on both sides of the tub so we each have our own... awesome!

No comments: